Construction began on a much smaller division than I have planned (apartment living will do that) but none the less the layout was constructed to be A) taken apart and integrated into a larger layout and B) a fun operating layout with a good C&O feel to it.
Benchwork is an open grid on standard 2x2 and some 2x4's 4" of pink foam is layed on top for a good base for the mostly flat terrain of northern central Michigan.
No comments:
Post a Comment