Track work progressed through out the summer and when availible until the mainline was completed july 1st 2010. Track work was Atlas code 100 flextrak with number 8 turnouts on the mains and CTC sidings and number 4 and 6 turouts for various yard tracks.
The river crossing was loosely mocked up as the first few trains began to test out the layout and streach their feetSwitch locomotives in Saginaw/Ludington staging areas idle as they eagerly await switiching the loads of cars coming thru to the freey docks
No comments:
Post a Comment